Hallen provided labor, material and equipment to install 69kV transmission line from Southampton to Bridgehampton substations. The scope of work included trench excavation, backfill and sheeting as required. The receiving, unloading and setting P.C. concrete manholes. Fusing and installation HDPE and concrete pipe. Cable pulling and splicing. Asphalt, concrete and lawn restoration.